Developing the project
To provide a secure storage facility for its future ash output, APS developed a lined facility covering 128 acres. West States Skanska was responsible for the earthwork needed to build the pond berms and subgrade.
Constructing the project
West States mobilized a large fleet of equipment to prepare the site for liner installation. Project activities were closely coordinated with APS so that the membrane liner placement could move ahead unimpeded. West States’ subgrade construction met exacting quality specifications to ensure integrity of the membrane liner system as it was laid across the massive pond.